We build and operate sustainable infrastructure campuses combining high-voltage power, recycled water systems and intelligent microgrids to enable ESG-compliant hyperscale digital infrastructure.
Purpose-structured to appeal to property funds, infrastructure investors and tech VCs — each with a standalone case backed by hard numbers.
Buy cheap greenfield or brownfield industrial land near transmission corridors across Australia. Zone it. Power it. Lease or sell at 3–5× uplift. Transmission-adjacent sites in every major capital are scarce and being locked up fast.
→ Property funds · Family offices · Land developers
Own the substation, transmission line and microgrid across multiple voltage tiers — 66 kV through 500 kV — tailored to site scale and state grid. Regulated-equivalent long-duration yield from energy resale, FCAS and embedded utility income.
→ IFM · Superannuation · Infrastructure funds
Proprietary EMS software — NEM-trained ML dispatch, patent-pending islanding algorithm, API-first architecture. A data flywheel that improves with every site commissioned across the national portfolio. Real moat, real revenue.
→ Climate VC · Deep tech · Grid-edge software funds
The sub-66 kV network was built for households and factories — not 200 MW AI campuses with five-nines uptime requirements.
We skip the distribution queue — connecting direct to 66 kV, 132 kV, 220 kV, 330 kV or 500 kV transmission depending on site scale and state network topology.
From 66 kV regional connections to 500 kV ultra-high-voltage hyperscale campuses — our platform is designed to work at any voltage level, sized to the site, the state grid and the tenant demand profile.
| Voltage | Network type | Max load | Typical use case | Est. substation cost | DUOS avoided | IP states |
|---|---|---|---|---|---|---|
| 66 kV | Distribution (upper) | 50–100 MW | Regional DCs, edge sites, industrial parks | ~$5–8M | Partial | All states |
| 132 kV | Sub-transmission | 150–250 MW | Mid-scale hyperscale, regional DC parks | ~$12–20M | ✓ Full | QLD · SA · WA |
| 220 kV | Transmission | 300–600 MW | Hyperscale campus, sovereign cloud, multi-tenant precinct | ~$30–50M | ✓ Full | VIC · NSW · QLD |
| 330 kV | Transmission (NSW backbone) | 500–800 MW | Giga-scale AI campus, national cloud anchor | ~$55–75M | ✓ Full | NSW corridor |
| 500 kV | EHV Transmission (VIC/WA) | 1,000–1,500+ MW | Multi-GW campus, hyperscale + renewable integration | ~$80–120M+ | ✓ Full + FCAS | VIC · WA |
Actively identifying and securing sites from Perth to Brisbane — anchored by proximity to each state's transmission backbone and proximity to REZ corridors.
Purpose-built EMS/SCADA operating at grid-edge with real-time ML optimisation — trained on Australian NEM data and deployable at any voltage tier from 66 kV to 500 kV.
Capital deployed in tranches — each round funds the next milestone before major expenditure is committed.
Execution-led team spanning transmission, development, planning, delivery and operations. Built for high-stakes infrastructure and long-dated leases.
Tell us what you’re looking for and we’ll share the right material: pipeline overview, investment structure, and site-level specs.
We are currently in Round 1 discussions with selected investors. If you are a property fund, infrastructure investor or tech VC interested in Australia's AI infrastructure opportunity, we'd like to hear from you.